Safety before documentation
Keep people away from unsafe structures, electrical hazards, active leaks, and contaminated areas. Emergency response and necessary professional mitigation come before cosmetic repairs. Do not enter or disturb a site that officials or qualified professionals have identified as unsafe.
Build a dated record of the damage
Where it is safe to do so, photograph affected rooms, ceilings, floors, equipment, and belongings before significant changes occur. Record when the incident was noticed, any emergency actions taken, and the names of mitigation providers or insurance representatives.
Separate mitigation from rebuilding
Stopping further damage, drying or securing the property, and the later reconstruction scope are different stages. Ask for documentation of completed mitigation and a clear account of what materials were removed or retained.
Coordinate scope and insurance information
If an insurance claim is involved, preserve claim details and adjuster correspondence. Coverage and payment decisions belong to the insurer under the policy; construction estimates should identify work and assumptions without promising a claim outcome.
Prepare the repair request
- Share the property address and the type of damage.
- Provide photos, dates, and the current condition if safe.
- Include mitigation reports, inspection notes, and available drawings.
- Identify occupancy, access, and timing restrictions.
- Request a project-specific reconstruction review and written scope.